Welding and Fabrication

BeforeAfterThe Problem
A 2nd floor balcony was needed. Beams would need to be installed to hold the weight of the balcony.
What Dan Did
Columns were prepped prior to installing beams. Holes were drilled evenly spaced to allow attachment of wood framing. Beams were raised into place, and welded to the top of columns.
The Result
A 2nd floor balcony was established.